An examination of Florida’s 2010-2013 Statewide Transportation Improvement Program reveals projects classified as “other,” which include appropriations to the state’s infrastructure bank, statewide contingency funds for unspecified projects and non-project specific transportation planning funds, account for the largest chunk of the state’s proposed expenditures (32 percent). At 23 percent of the STIP, road maintenance/minor widening projects follow. New road capacity projects account for 19 percent and transit projects*15 percent of the planned spending. Bridge maintenance/replacement projects make up 5 percent of the program, and safety projects 3 percent. Bridge capacity expansion projects account for 2 percent of the proposed spending, and bicycle/pedestrian projects 1 percent. Less than 1 percent of the STIP’s funds are spent on road or bridge projects with bicycle/pedestrian components (such as adding sidewalks when reconstructing a roadway).

Proposed Spending, FY 2010-2013

Project Type Cost (Millions)
Total $31,775.19
Bridge Maintenance/Replacement $1,546.81
Road Maintenance/Minor Widening $7,351.92
Road/Bridge Project with Bike/Ped Components $0.62
New Road Capacity $5,998.82
Transit* $4,867.41
Bicycle/Pedestrian $355.25
Safety $909.08
Bridge Capacity Expansion $464.34
Other $10,280.94

* Transit total does not include $530 million of state operating assistance to transit and state operating/administrative assistance to transit.

Percentage of STIP by project type

  • bmr
    5
    Bridge Maintenance/Replacement
  • rmmw
    23
    Road Maintenance/Minor Widening
  • rbbp
    1
    Road/Bridge Project with Bike/Ped Components
  • nrc
    19
    New Road Capacity
  • tran
    15
    Transit
  • bp
    1
    Bicycle/Pedestrian
  • sfty
    3
    Safety
  • bce
    2
    Bridge Capacity Expansion
  • othr
    32
    Other