An examination of Maine’s 2010-2013 Statewide Transportation Improvements Program reveals that transit projects account for the largest chunk of planned spending (28 percent).* Road maintenance/minor widening and bridge maintenance/replacement follow, 22 percent and 19 percent respectively. The “other” category accounts for 16 percent of the planned spending and includes items such as general planning expenditures, freight costs and information technology. Road or bridge projects with bicycle/pedestrian components (such as adding sidewalks when reconstructing a roadway) make up 7 percent of planned spending. Bicycle/pedestrian projects comprise 3 percent of the program, as do new road capacity projects. Safety projects comprise 2 percent of the program, and, at less than 1 percent, bridge capacity expansion projects make up the smallest share of the proposed spending.

Proposed Spending, FY 2010-2013

Project Type Cost (Millions)
Total $961.51
Bridge Maintenance/Replacement $181.10
Road Maintenance/Minor Widening $210.41
Road/Bridge Project with Bike/Ped Components $68.88
New Road Capacity $30.31
Transit* $264.91
Bicycle/Pedestrian $28.06
Safety $20.64
Bridge Capacity Expansion $1.20
Other $156.00

* The transit component includes a $110 million in ARRA funds for High-Speed Intercity Passenger Rail.

Percentage of STIP by project type

  • bmr
    19
    Bridge Maintenance/Replacement
  • rmmw
    22
    Road Maintenance/Minor Widening
  • rbbp
    7
    Road/Bridge Project with Bike/Ped Components
  • nrc
    3
    New Road Capacity
  • tran
    28
    Transit
  • bp
    3
    Bicycle/Pedestrian
  • sfty
    2
    Safety
  • bce
    1
    Bridge Capacity Expansion
  • othr
    16
    Other
All percentages rounded