Planned Transportation Spending

California

An examination of California’s 2010-2015 Statewide Transportation Improvement Program reveals that transit projects* account for the largest chunk of planned spending (26 percent). Road capacity expansion and road maintenance/minor widening projects follow, each 24 percent of the STIP. Projects classified as “other” make up 10 percent of the planned spending.** Safety projects are 5 percent of the planned spending. Bicycle/pedestrian projects account for 4 percent,*** as do bridge maintenance/replacement projects. Bridge capacity expansion projects comprise 3 percent of the STIP. Road or bridge projects with bicycle/pedestrian components (such as adding sidewalks when reconstructing a roadway) account for less than 1 percent of the planned expenditures.

Proposed Spending, FY 2010-FY2015

Project Type Cost (Millions)
Total $91,400.66
Bridge Maintenance/Replacement $4,053.39
Road Maintenance/Minor Widening $22,125.65
Road/Bridge Project with Bike/Ped Components $104.11
New Road Capacity $21,981.24
Transit* $23,301.49
Bicycle/Pedestrian** $3,938.61
Safety $4,665.50
Bridge Capacity Expansion $2,407.73
Other*** $8,822.94

* Transit total does not include $689 million in state and local funds for operating assistance or the Express Bus System component of the I-15 Managed Lanes project. It is estimated that $115 million of the $1.3 billion project (8.8%) will go to creating an express bus system. This project was classified as new road capacity.
** $2 billion of projects classified as other includes rideshare and 40 percent of transportation enhancement (TE) funds that are not specifically bicycle/pedestrian projects.
*** $870 million of bicycle/pedestrian projects include specific bicycle/pedestrian improvements and 60 percent of TE funds that are not specifically bike/ped projects.

Percentage of STIP by project type

  • bmr
    4
    Bridge Maintenance/Replacement
  • rmmw
    24
    Road Maintenance/Minor Widening
  • rbbp
    1
    Road/Bridge Project with Bike/Ped Components
  • nrc
    24
    New Road Capacity
  • tran
    26
    Transit
  • bp
    4
    Bicycle/Pedestrian
  • sfty
    5
    Safety
  • bce
    3
    Bridge Capacity Expansion
  • othr
    10
    Other
All percentages rounded